Dringend interventie nodig?
Bel: +32 (0)498 87 65 23

Revision ship lift naval port Zeebrugge

Project type: Industrial maintenance
Industry: Defence
Location: Zeebrugge
Execution year: 2018

Problem or question of the client?

After 35 years of service, the ship lift requires a total revision.
Replacing all winch disks, cables, manufacturing new capstans. Revision of the hydraulic group. Clamping/locking cylinders.

De Pecker has the knowledge and the knowhow to execute this in a fast and precise manner.
This project is executed in several phases. We make all the preparations in our workshops and carry out the revision at the navy’s location.

Our approach?

De Pecker was selected for the execution of this job through a public tender. DPG has been taking care of the recurrent maintenance of the ship lift for many decades.

End result?

The navy has a safe and reliable ship lift again to pull the vessels from the water. They don’t have to worry about it for the next 35 years. This ship lift will be functioning again for a considerable amount of time thanks to the high level of quality we deliver.

OP ZOEK NAAR UW IDEALE PARTNER VOOR ONDERHOUD, MAATWERK OF MACHINEBOUW?

Als ervaren machinebouwer zijn wij uw partner voor het industrieel onderhoud van uw machines en installaties. Contacteer De Pecker Gent voor een vrijblijvende bespreking van uw wensen en verwachtingen.

Contacteer ons